Sunday, January 26, 2014

Almost at drywall stage!

Jan 26 - lots has been going on...plumbing inspections, mechanical inspections, electrical inspections, insulation, security wiring, in-ceiling speaker wiring and various other odds and ends....see for yourself!

New front deck/porch/verandah (whatever your word for it is) is in place thanks to my dad!

landing outside the front door

should be lovely to sit out here on a warm summer evening!

Barrel ceiling for hallway to dining room (again thanks to my dad!)

Below you can see that Imperial Drywall has the insulation and vapour barrier underway...
 Dining room
 Great Room
 Kitchen/Nook
 View to upper floor loft from landing
 View to upper floor hallway from landing
Master Bedroom 
View from Master bedroom towards door 
Ensuite/walk-in-closet 
Ainsley's room 
 Spare room/play room
Loft 
Basement Rec/Media room 
 Basement bedroom #1
Basement bedroom #2
Christiaan and Dave working on putting the Tyvek on the garage
View from avenue/back alley
Back entry deck is also in place
Back of the house

So the drywall is being loaded up this week which is really exciting because then we will really get a feel how the space will be!  In the meantime, I've been working on selecting trims, doors, tile, granite....so much work and never enough time!  Kitchen cabinets will be ordered this week, we discovered the fridge I had originally selected wasn't going to work so I had to go shopping again for a fridge...but I am hoping to make my final choice tomorrow and then order the cabinets shortly thereafter! 